Monday, November 28, 2011
Horizontal Stab and Elevators Complete
Sunday, November 6, 2011
Horizontal Stab and Elevators
The horizontal stabilizer skeleton is complete and primed. This took a while to line up, clamp, double check measurements, make sure it's right, triple check measurements and finally drill and cleco. In the end I remade several ribs because the width of some of the preformed rib channels were slightly smaller than the preformed spar channels. I didn't want any unsightly bumps in the polished skins so I took the time to fix it.
Here is a shot of the structure just before closing it up for good. You can see the skins only got zinc phosphate where they touch the fully primed skeleton.
This is the current status. Left HS complete and working on the skin on the right side. All the holes are drilled, just have to debur, prime and rivet. I may be taking a bit of a break after this step. Our second baby is due in a week and I'm sure I'll be spending a lot of time away from the project with baby girl.
Subscribe to:
Posts (Atom)